From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Larry W. Bailey CMIII 172 Gardners Grove Drive McDonough, Georgia 30252 (404) 406-3705 Mobile larrywb@bellsouth.net OBJECTIVE
To
acquire a position with a growing company that will utilize my management and
leadership skills and challenge my abilities in all areas of
Construction/Project Management. Strong abilities to lead, teach or guide
where & when needed.
SUMMARY
·
CIVILS- Clearing, Grading, Tower
Foundations (mat/pier, spread footings, caissons), Concrete Pad Work,
Retaining Wall Systems, Electrical/Grounding System Installations,
Fencing/Landscaping, Site Maintenance, Boring, Trenching, Paving, Equipment
& Shelter Transportation & Setting, Utility and Telco Construction,
Erosion Control, Geo’s, T-1 Upgrade, Power/Telco H-Frames and Common Demarks.
·
TOWER- New Construction & Tower
Erection to include (Self Support, Monopoles/MonoPines, Flag Poles, Light
poles, Billboards, Church Steeples, Guyed Towers and Stealth Installations),
Antenna and Line Installation, Equipment Installation, Sweep Testing
Modifications, Roof Top Work, Vaults, Structural reinforcement and
strengthening, Tower Mapping, Tower Decommission, Tower Lighting, Microwave
Hops, Path Alignments ·
15 years of Construction/Project Management within the
wireless industry. Working with clients such as T-Mobile, Crown,
Nextel, SBA, Sprint, Metro PCS, Cingular, AT&T, LA Unwired, Powertel,
VoiceStream, Verizon, GTE, Alco/Charter Communications, Pac 17, Bectel, Law
Engineering, Triton, Tritan, SunCom, Mountain Union, WFI and ClearWire. ·
Able to handle multiple projects at one time ranging from
$35,000 to $750,000 and staying within budget and time frames. ·
Excellent managing, negotiating, and leadership skills
with use of diplomacy. ·
A team player at meeting customer needs, problem solving,
mediation, and motivation. ·
Ability to learn new areas of business at a rapid pace. EXPERIENCE
Ericsson
Construction Manager Cart/TN
AWS/LTE/PCS
May 2015 to Present Responsibilities
include completion of daily scheduling. Monitor all construction work
in the field. Monitor and address quality issues in the field in regards to
construction. Coordinate day and night activities with all market contractors
including Verizon managed groups. Provide daily updates as to site
readiness. Coordinate punch walks with SP & ASPs. Help
troubleshoot any issues with Verizon techs in order to resolve trouble
tickets as promptly as possible. Attend meetings with Verizon. When needed
conduct the daily bridge. Responsible for all activities and scheduling of
the Tiger Team to correct and eliminate any issues that would impair market
launch. Responsible for site scoping walks, build BOMs, upload into Site
Handler and CAM tool as well as monitor CART Tool. Jacobs
Engineering
CM/PM
April 2014 to May 2015 Responsible
for all aspects of cell site construction for Ericsson/Sprint 65MHZ Alabama
and Florida Panhandle (Gulf Market). Manage all day to day construction and
tracking of project as well as trouble-shooting for successful launch of
market sites. Helped with maintaining and delivery of needed materials.
Managed SPs & ASPs as well as in-house crews. Use element manager to set
& reset rets. Responsible for scheduling VPW (Virtual Punch Walk) and follow-up
on any punch items. Responsible for entire TMO (T-Mobile) AAV project
covering Alabama and Georgia, from scheduling to construction and permitting. Ericsson
C-Spire LTE Verizon LTE
Contractor
August 2013 to April 2014 Responsible
for all aspects of cell site construction for C-Spire LTE in Mobile Alabama
and Florida Panhandle. Manage all day to day construction and tracking of
project as well as site re-design and trouble-shooting for successful launch
of 140 sites. Helped with maintaining and delivery of needed materials and
RBS cabinets as well. Managed 4 SPs & ASPs., Smart Laptop testing &
integration. MyCom
USA AT&T
LTE
June 2013
to August 2013 Responsible
for all aspects of the West Virginia Mycom/AT&T market with over 200
sites and growing. Budget and timeline management as well as managing the day
to day with 5 field CMs and 6 civil technicians, hiring and firing
responsibilities of my personal as well as GCs. I have one office manager
that reports to me and helps me keep the tracker actuals and projections on
course. Contractor
FCM NSN/TMO
Modernization
Sept. 2012 to
June 2013 Responsible
for managing 195 plus sites for TMO fiber and LTE installs as well as
the C&I person during cut overs, help the BTS engineer and GC integrator
to trouble shoot fiber, FSME, ESMB, FXFB during cut. Attended C&I class,
passed with 99 1/3 points. Contractor
Lead CM
BV/OC-SNV/Samsung
May 2012 to Sept. 2012 Manage
all aspects of building SNV cell sites including Field CMs and GCs as well as
building PORs and BOMs for said sites. Ericsson
Private Contractor Regional Construction /Project Manger –
Verizon LTE
April 2010 to May
2012
Lead
CM Verizon LTE Tennessee - Conducted seventeen crews to complete 44 sites in
twelve days in order to meet commitment to Verizon. Responsible for building
BOMS/MOPS, training GC’s how to upload all documentation in Site Handler,
review all close out documentation, have GC’s correct punch items, ensure
project stays within budget , excess equipment is returned to warehouse and
ensure GC’s are correctly running PM and sweep test according to Verizon
specifications. Ericsson
ClearWire
Ericsson
private contractor working for Clear Wire deploying their license save
project all over the United States, Puerto Rico, and Alaska. Deploying their
WI-FI network as well as bringing T1 and backhaul to the sites. Designed the
BOM and the BOM process through Tesco as well as building
material SOW. Approve CD’s and set up BSS process for NIC material. Change
order approval and execution. Monitoring and updating ClearVision and spread
sheet rearrangement within CV Ericsson
Sprint Network
Vision
Ericsson
Private Contractor for Sprint Network Vision. Transferred from Ericsson
ClearWire to Ericsson SNV project in Atlanta Georgia as Construction Manager.
Responsible for all aspects of 3G & 4G Construction Management of set
number of sites. Manage
all dates forecast and actual in Site Handler for said sites as well as the
financials and PO's. Manage the A&E firms doing the A&E walks and
audits with each firm and redlining the CDs to make all necessary
corrections. Walked all sites with the AAV vendors as well as redlining AAV
plans to determine what is needed to bring fiber, microwave, or copper to
accomplish communication needs at each site. Coordinate
with GCs, NAL and other parties to set up crane, boom truck and permissions
to do hot slide, cold slides or no-slides as necessary to set new cabinets. .
Private
Contractor
June 2009 to April 2010 Private
contracting through third party vendors; Leadcom, Seneca, Westower, to do
pre-cons and post-cons, site walks, and bid walks plus consulting on Project
Management as well as Construction management on Verizon, Alltel, T-Mobile,
Towercom and some Motorola. I helped put together tracking and closeout needs
and requirements. For the last 6 months I have been doing PM/CM work on a
Clear Wire project for their WI-FI nationwide build. Private
Contractor Atlanta AT&T
MODS
March 2008 to May
2009
Project
Construction Manager .PM/CM over all field CM’s in the process of full site
audits for AT&T, and RFDS redlines. Processing quotes for site mods and
the decommissioning of old TDMA equipment. Responsibilities
include field management for civil construction and process for building
OOM’s, FAB’s as per
AT&T specs. Full spectrum training of rookie CM’s from pre-cons, quotes
to site construction and punch walks. Review, correct and QA site audits done
by others using pictures and information gathered at the sites. I performed
complete ground-audits as a one man team including pictures and site sketches
as well as electronic input to local company drive. Manage Ret project from
po to completion as well as ordering antennas and material and resolving
issues on sites with access problems and landlord disputes. . Private
Contractor Atlanta T-Mobile
UMTS
February 2007 to March
2008
Project
Construction Manager .PM/CM over all field coordinators in the process of full
site audits for T-Mobile through Nokia, as well as producing field site
sketches for the purpose of determining proposed locations for Nokia
Flexi-Cabinet in combination with Purcell Power Cabinet.
Responsibilities include field management for civil construction and process
for building BOQ’s, FPQ’s as per T-Mobile and Nokia specifications. PM over
2G/3G site construction, UMTS, site inspections, in charge of as many as 25
crews and10
construction managers, as well as managing other PMs along with 5 different
trackers governing all the construction, scheduling, and site inspections.
Ericsson
Cingular UMTS
June 2006 – February 2007 Responsibilities
include completion of daily scheduling. Monitor all construction work
in the field. Coordinate with Telco and power providers in order to
schedule and provide utilities for each site. Monitor and address
quality issues in the field in regards to construction. Work with power
provider, Telco provider, and contractors to resolve said issues.
Provide other market CM’s with daily task and scheduling. Coordinate
day and night activities with all market contractors including Cingular
managed groups. Provide daily updates as to site readiness.
Assist CM’s with set-up and scheduling of site scrubs in order to provide
CCI, Emerson, and Parsons with proper information in order for them to
complete their part of the UMTS project. Coordinate punch walks with
CM’s and contractors. Help troubleshoot any issues with Cingular field
techs in order to resolve trouble tickets as promptly as possible. Help
out with scrubs, Telco issues, and quality assurance within the Charlotte and
Greensboro UMTS market. Attend all meetings with Cingular and BellSouth to
help speed up the process of NIU re-lo’s. When needed conduct the daily
bridge. Responsible for all activities and scheduling of the Tiger Team to
correct and eliminate any issues that would impair market launch. Compass
Technology
February 2006 – June 2006 Contract
directly to Cingular as Transport Field Engineer. Responsible for all
Telco coordination between BellSouth, Cingular, and contractor up to and
including assisting night NIU re-lo’s. Maintained balance between
Cingular, BellSouth, and contractor as to issues and scheduling for the
appropriate actions to complete the job. This was all pertaining to the
UMTS Cingular project in the Carolina’s. Morrison
Hershfield/Atlanta
January 2004 –
February 2006 ·
Responsible for all aspects of project management of
Nextel co-lo’s and raw land cell sites in the Georgia build-out. Responsible
for all aspects of Construction Management for green field and co-locates of
wireless communication sites. Work directly with Area Manager to expand
customer base and maintain existing customers, as well as help develop all
aspects of this market. Manage all paperwork and subcontractors associated
with all Projects in the field while adhering to clients’ timelines.
Responsible for pricing and control of budget of $100,000.00+ projects. John
Wieland Homes and Neighborhoods2002 - 2004
Neighborhood
Production Coordinator
·
Responsible for electronic and manual ordering for homes
under construction, permitting, inspections, neighborhood updates to
corporate, and invoicing. Work directly with 5 builders.
Responsible for coordinating construction of homes with subs and vendors as
well as track all paperwork associated with same. Work with Excel and
Word to process all documents and P.O. corrections/updates through
intranet. Project consists of approximately 400 homes. INS
Inc.
2001 - 2002
South East
Senior Project Manager
·
Responsible for all aspects of Construction Management for
green field and co-locates of wireless communication sites. Work directly
with Area Manager to expand customer base and maintain existing customers, as
well as help develop all aspects of this market. Manage all paperwork and
subcontractors associated with all Projects in the field while adhering to
clients’ timelines. Responsible for pricing and control of budget of
$100,000.00+ projects. Alpha
Omega (Crown Castle USA)2000 - 2001 Construction
Manager, Tower Attachment Program ·
Manage all aspects of construction management for the
Atlanta Market. ·
Managed subs to ensure timelines were met and safety
requirements followed. ·
Responsible for pre-con meetings with all parties
involved. ·
Maintained accuracy of budget and follow through of punch
lists. ·
Inspection of sites for safety issues, quality of work,
and to see that company policies are being followed. Clear
Communications, Inc. Atlanta, Georgia 1997 - 2000 Senior
Project Manager ·
Managed assigned sites from inception to completion, from
permitting to C.O., as well as completion of punch list when necessary.
·
Managed, trained, assisted, and evaluated Junior Project
Managers and Project Managers with their sites. ·
Bid walks as well as helping determine pricing for
purposes of quoting and billing. ·
Assisted Operations Manager in the process of scheduling
all Project Managers, Civil, Lines and Antennas, and Tower crews. ·
Use of my mechanical and electrical background to aid the
electrician and civil crews, as well as doing actual wiring (interior and
exterior), cadwelding, grounding, digging, site layout. Also, assist
tower crews when they are short handed, (building ice bridges, running cat
head and assembly of antennas, etc.) ·
Assist client Project Managers in redesign of site layout
when I see a better way to make it work. Dixon
Tom-A-Toe, Forest Park, Georgia 1995 – 1997
Senior Maintenance Technician/Supervisor ·
Second in Command of Maintenance Department, under Plant Engineer.
Supervise and schedule maintenance employees for 3 shifts. ·
Repair and Programming of Equipment, including wiring
electric motors, programming CVP z 1200 computers, use of PS and LS switches
(proximity and limit) DC and AC Controllers ·
Training other mechanics, paperwork, decision making,
monitor freon refrigeration computers and temperature controls, maintain
Strantrol Automated Chemical disbursement systems, also repair of printers,
copiers, and calculators Weisz
Graphics, Chapin, South Carolina1994 – 1995
Print Technician ·
Responsible for setups and quality of product from start
to finish (decals, slats, advertisements, and four color process) ·
Repair of press and heat system Johnson
Control Inc., Columbia, South Carolina1991 – 1994
Production Mechanic Lead ·
Responsible for setups, repair and modifications of RHB’s
and support equipment in the process of making two and three litre, sixteen
and twenty ounce plastic bottles; Manage all production data and turn in
sheets for 3 shifts. ·
Use and repair of LS and PS switches and electric motors. ·
Worked directly with plant engineer. Responsible for
production records and forecast for four shifts. EDUCATION
Miller/Troll
Fall Protection and Competent Person One/Certified Trainer, 2001
Hayssen School of Weight, Command, and Packaging, 1997
Georgia Southern College, 1971
Monroe Area High School, 1970 ·
RF Protection Training ·
TRW Basic Lighting ·
Business Administration ·
Insurance Calculation ·
Defensive Driving ·
Supervisory Training ·
Employee Relations ·
RHB Technician School ·
Forklift Driving ·
Pole Climbing ·
Basic Electronics |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|